The contractor is responsible for providing all labor, materials, equipment, and supervision for the work listed below. It is the responsibility of the contractor to verify all quantities. • 2" Asphalt Resurfacing of English Park Drive, including all driveways and intersections; full-depth patching, milling, and drainage; and removing the hump in the street to divert stormwater. • Approximately +/- 900 linear feet of roadway. • Remove (3) catch basins/inlets and 330 linear feet 18" pipe. • Install (1) Type 9 catch basin, (2) 24x36 drop inlets, and 330 linear feet of 24" HDPE pipe. • Permanent grassing for stabilization after resurfacing. • Must have positive drainage to the existing stormwater system. • All work must meet SCDOT resurfacing specifications.