Deep Wells & Chemical Feed Buildings Improvements project consists of constructing two (2) new deep wells to the depth and diameter detailed in the project Specifications and Construction Plans and constructing two (2) chemical feed buildings. The project shall include, but is not limited to, providing all labor, equipment, and materials to construct the project including pump, motor, valves, yard piping, painting, electrical generator, video, logging and performing a 24-hour pump test, disinfection, driveway, fencing, site grading and all associated appurtenances required for a complete project. The minimum depth is expected to be ±300 feet. This work will be awarded in one (1) contract with a 270 consecutive calendar day construction schedule.