Open cut repair of 169 l.f. of sewer, replacement of three (3) sewer service connections, installation of two (2) manholes, open cut repair of 176 l.f. of drain, installation of 26,062 l.f. of structural cured-in-place pipe and reinstatement of 514 services, grouting of 253 service connections, cutting 53 protruding service connections, cementitious lining of 929 v.f. of manholes, installation of seven (7) manhole frame and covers, locating and raising of three (3) manhole frame and covers, building of 17 manhole bench and inverts, removing and plugging of four (4) abandoned sewers, installation of five (5) vertical feet of internal drop connections, installation of three (3) lateral liners, and cleaning and inspection of 1,495 l.f. of sewer and drain.