Contract 1: Village of Sauk City Sponsorship – WisDOT Construction ID 5852-00-75 Construction of a new multi-modal, prefabricated steel truss bridge (with safety mesh features), decorative gateway features, construction access work, and surface/pavement restoration. These work items will include but not be limited to: removals, excavation for structures, concrete masonry bridges, prefabricated steel truss pedestrian bridge, Cast-In-Place (Pipe Pile), drilled shaft, backfill structure type A, excavation common, base aggregate dense, polymer overlay, steel and timber rail, asphaltic surface, concrete trail, concrete curb & gutter, structure lighting, clearing and grubbing, erosion control, restoration, signing, pavement marking, and all incidental items necessary to complete the work as shown on the plans and included in the project manual and contract. Contract 2: Dane County Sponsorship – WisDOT Construction ID 5666-00-78 Rehabilitation of an existing rail bridge structure to accommodate multi-modal use, concrete retaining walls, and connecting trail and construction access work. These work items will include but not be limited to: removals, bridge rehabilitation, timber bridge construction, excavation for structures, backfill structure type A, concrete masonry bridges, concrete masonry retaining walls with piling, excavation common, base aggregate dense, asphaltic overlay, steel and timber rail, asphaltic surface, concrete trail, polymer overlay, concrete surface repair, clearing and grubbing, erosion control, restoration, , and all incidental items necessary to complete the work as shown on the plans and included in the project manual and contract.