202.7 REMOVAL OF GUARDRAIL LF 18,500.00 203.5561 EAGRT PLATFORM PREFERRED U 34.00 203.5562 EAGRT PLATFORM ALTERNATE U 1.00 203.5571 EAGRT PLATFORM PREFERRED, TL 2 - 25' U 1.00 203.5598 GUARDRAIL E-3 PLATFORM LF 120.00 206.1 COMMON STRUCTURE EXCAVATION CY 8.00 304.301 CRUSHED GRAVEL CY 7.00 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 680.00 403.11023 HBP-3/4" BINDER MIX, MACHINE METHOD TON 2,200.00 403.11942 HBP-1/2" SURFACE MIX, MACHINE METHOD, HIGH STRENGTH, QC/QA TIER 2 TON 1,600.00 403.12 HBP-HAND METHOD TON 41.00 403.16 PAVEMENT JOINT ADHESIVE LF 8,700.00 410.22 ASPHALT EMULSION FOR TACK COAT GAL 8,800.00 411.3 PLANT MIX SURFACE TREATMENT, PAVER SHIM TON 4,700.00 417. COLD PLANING BITUMINOUS SURFACES SY 35,000.00