Contractor shall demolish and remove all above-grade and below-grade improvements, debris and appurtenances within the Demolition Area, including, without limitation, the main building structure and/or any detached structures, all basements, footings, foundations, floors, porches, private sidewalks and debris of any kind. Contractor should take into consideration the County’s explicit preference that the main building structure be demolished on December 31, 2024/January 1, 2025 at or about 11:59PM/12:00AM. Contractor shall include the demolition and removal of all parking slabs, concrete and/or asphalt flatwork (not including city sidewalk and curb/gutter), accessory/ detached structures, sheds or garages, trees (including stumps), or any underground piping, junk, trash or dead trees which may be present within the Demolition Area. Contractor shall provide all necessary interior and exterior shoring, bracing, or support as required to prevent movement or settlement or collapse of structures to be demolished, and to ensure that any neighboring facilities remain unmolested. No debris, other than crushed masonry debris used to backfill the former basement area, shall be left or buried on the site. All removal of debris, rubbish, and other materials resulting from demolition operations within the Demolition Area must be disposed of in accordance with the requirements of the RFP and applicable law.