DEMOLITION/SITE PREPARATION: 1. All debris to be removed from site and disposed in accordance with local regulations. 2. Remove trees/vegetation (incld. stumps) as necessary to construct the new dwelling. Trim any trees over hanging roof to clear roof by approximately 10’ and remove all debris from site. If necessary, coordinate with a certified arborist to obtain approval to remove/trim protected trees. TERMITE CONTROL: Supply termite statement for building permit. Engage a professional pest control operator and provide soil treatment for termite control with certification of treatment. SURVEYS: Coordinate with a licensed surveyor to pin the location of the house on the property and to obtain the final survey. Final survey must be submitted electronically. DIVISION 2—SITE WORK WATER AND SEWER SYSTEM: Install water and sewer system connections per Florida Building Code and ECUA requirements. EROSION CONTROL: Provide erosion control on the site during construction as required to include silt fencing, mulch, and/or other approved methods. GRADING: Final grading should slope away from the house to prevent water from standing. Contractor will not leave any ruts or holes on the property at project completion. Backfill should be clean of rocks and any debris. LANDSCAPING: 1. Slope grade away from house and install a total of 8 pallets of Centipede sod for the front, sides, and back yard. 2. Use clean topsoil for landscaping, not red clay or sand...