The expansion of the Elizabethtown Community and Technical College Leitchfield campus will construct a new single story, standalone 16,733 SF building directly west of the current sole campus building. This new facility will house Industrial Maintenance Labs, Nursing and Health Science Labs, new classrooms and an open office administration suite with a workroom and conference room. The existing and new building will be connected with an open-air canopy. There is one add-alternate for a new parking lot to the West of the new building. Exterior wall construction will consist of loadbearing CMU and structural steel on reinforced concrete stem wall and spread footings. Spray foam insulation with brick and metal wall panel comprise the exterior skin of the building. The roof system will be 2-ply SBS roofing over low-slope tapered polyiso insulation board to internal roof drains on level roof structure. Interior walls will be a combination of CMU bearing walls and metal stud with gypsum board. Flooring will be a combination of VCT, sealed concrete and ceramic tile flooring. Ceilings will be primarily acoustic lay-in tiles accented by gypsum board soffits and bulkheads. The mechanical system will be geothermal with distributed heat pumps. A water-source heat pump DOAS will provide conditioned ventilation air. The building will be fully sprinklered.