1) Window ReplacementA. Install (3) new casement window. 1. Located at D Façade b) Verify sizing c) Paint or stain new or disturbed work d) Install insulation in cavities and caulk all edges e) All windows to have the energy star glazing package. f) Units to be white g) All operable units to include full standard fiberglass mesh screens h) Refer to specifications for additional information i) All work to be performed to code requirements 2) Exterior Vinyl Siding - Division 7 (Alternates 1-4) A. Provide and install vinyl siding and white aluminum coil stock on all doors, windows, soffit and fascia including front porch and rear deck ceilings. a) Located on “A-D” facades, b) Remove existing siding and aluminum trim c) Replace rotten or degraded wood prior to installing new finishes (sheathing allowance $65.00 and sheet) d) Provide photos of sub framing before installing new sheathing, trim, jamb or sills and send to Housing Rehab specialist e) Install vapor barrier on exterior walls per manufacturer f) Install ½” rigid insulation over vapor barrier B. Install new vinyl siding; Certainteed Monogram 46-double 4” or equal a) Provide all necessary trims and starting strips including but not limited to; corner boards, J-channels, F-channels and mounting blocks b) Verify all window and door head flashing, provide if inadequate or missing prior to siding installation c) Re-install all low voltage wiring d) Colors to be chosen by owner from manufacturers standard colors e) Refer to specifications for additional information f) All work to be performed to code requirements