Service Provider shall deliver broadband Internet access to all SMSD locations from the two respective central network hubs at the Center for Academic Achievement (located at 8200 W. 71st Street, Shawnee Mission, KS 66204) and the Indian Creek Technology Center (located at 4401 W. 103rd Street, Overland Park, KS 66207); Service Provider shall provide true geographic network diversity. Internet Access should be provided by two different carriers over geographically diverse cable paths and preferably from two physically separate hub site data centers. Each Internet Access connection must support full bandwidth. Since 20GB is determined to be the required level of bandwidth for an Internet access connection from the Center for Academic Achievement Center hub and the Indian Creek Technology Center hub, then BOTH ISPs must support 20GB (2 x 10GB does not make it 20GB). That is, the connectivity infrastructure must be able to burst to 20GB on each circuit; Service Provider shall provide full BGP support...