The City of St. Peters is seeking bids for construction of storm water channel improvements to two open channels between Mid Rivers Mall Drive and Grand Teton Drive. The northern channel, is approximately 1,000 feet long, located behind the residences on the south of Grand Teton Drive. The southern channel is approximately 1,500 feet long and extends from Mid Rivers Mall Drive west, between Blackwood Lane and Glenwood Lane. The project improvements will reconstruct both channels to include: channel clearing, channel re-construction, retaining walls, rock lined channels, rock grade control structures, storm structure replacements, fence removals and replacements, and revegetation with rolled erosion control blankets and native plants.