This project generally consists of street improvements for approximately 1,700 linear feet along Main Street and Summit Street, portions of which are also CT Route 196. Work included is the removal of existing curbs and replacement with new granite curbing, new catch basin tops, construction of patterned concrete sidewalks and ramps with a shelf of brick pavers as well as concrete patio areas. Also included are renovated landscaped areas, new street trees and the installation of new benches. A portion of the roadways will require a 2” mill and pave which is to be completed by others. New pavement markings including thermoplastic patterned crosswalks will be installed. These markings will require coordination with the paving contractor to schedule this work. Other miscellaneous site work including regrading and turf restoration will be completed. The work described above includes furnishing and installing all materials into the project as well as performing or providing all labor, supervision, equipment and services unless otherwise noted within the bid documents.