3. BAKER COUNTY: OR86: Guardrail Upgrades Final Phase Project on the Baker-Copperfield Highway (Rt. No. OR86) beginning in Oxbow. FAP No. S012(032). ($ 2,000,000 - $ 5,000,000). Req. approx. 695 ft2 temp. signs; 2 ea PCMS; 1,665 hr flag.; 2 ea AFAD; 2 ea port. traf. sig.; const. surv. wrk.; temp. wrk. acc. & contain.; 385 ft curb mt. rl.; br. rl. wrk.; 0.03 yd2 conc. rep.; 0.03 yd2 resin bldup. over shal. rebar; 6,035 ea extra for post; 60 ea hand dug gd. rl.; 40,673 ft gd. rl.; 88 ft adj. gd. rl.; 125 ea delin.; 8,900 ft paint striping. Completion Time: September 30, 2025. Class of Work: Miscellaneous Highway Appurtenances. THIS PROJECT CONTAINS FUEL ESCALATION CLAUSE. THIS PROJECT CONTAINS A 15% DBE GOAL. THIS PROJECT CONTAINS A 12% INDIAN EMPLOYMENT PREFERENCE GOAL. PROJECT MANAGER: PETR LOVASIK, EMAIL: PETR.LOVASIK@ODOT.OREGON.GOV