The project includes the expansion and conversion of the existing St. Joseph Energy Center Water Treatment Plant (SJEC WTP) near New Carlisle, IN. The SJEC Phase 3 Expansion and Potable Water Treatment Conversion - Increasing the SJEC WTP filtration capacity by 6 MGD to a capacity of 18 MGD. The following is a general summary of the work associated with this project: a. Three pressure filters, each containing two filter cells, associated process water piping, controls, power wiring and control wiring will be designed to produce to up to 18 million gallons per day (MGD) of water. b. Two production wells and wellhouses c. A new approximately 0.4MG ground storage tank. d. Building expansion. e. Site piping f. Limited site improvements and restoration. g. Electrical power and control improvements. h. Structural, concrete, masonry and plumbing elements.