The work to be performed by the consultant consists of preparing engineering design and environmental NEPA permitting for CIP 22-07. The project improves 0.28 miles of Valley Ave. The project will grind and overlay Valley Avenue from the Sumner City Limits (just north of the interchange with SR 410) to Meade McCumber Rd E. The project will grind existing asphalt surface, repair failing pavement/subgrade, overlay the roadway, repair any damaged curbing, complete work to conform to current ADA requirements, restore pavement markings, and complete associated utility work as applicable. The current roadway section consists of 2-3 motorized lanes, dual bike lanes, on-street parking, curb, gutter, and sidewalk. This project has a 0% DBE goal for the design phase of this project.