1) Window Replacement; A. Install (3) new casement window. 1. Located at D Façade; b) Verify sizing; c) Paint or stain new or disturbed work; d) Install insulation in cavities and caulk all edges; e) All windows to have the energy star glazing package. f) Units to be white; g) All operable units to include full standard fiberglass mesh screens; h) Refer to specifications for additional information; i) All work to be performed to code requirements; 2) Exterior Vinyl Siding - Division 7 (Alternates 1-4); A. Provide and install vinyl siding and white aluminum coil stock on all doors, windows, soffit and fascia including front porch and rear deck ceilings. a) Located on “A-D” facades, b) Remove existing siding and aluminum trim; c) Replace rotten or degraded wood prior to installing new finishes (sheathing allowance $65.00 and sheet); d) Provide photos of sub framing before installing new sheathing, trim, jamb or sills and send to Housing Rehab specialist; e) Install vapor barrier on exterior walls per manufacturer; f) Install ½” rigid insulation over vapor barrier