PART 2 – PROJECT SCOPE OF WORK & SCHEDULE 2.1 Scope – This project includes, but is not limited to, all work required or inferred to complete the abatement and demolition of two existing building and all other work shown on the Silver Lane Plaza Demolition Phase 2 Construction Documents (issued 7/25/24), the bid specifications for Silver Lane Plaza Demolition Phase 2 (issued 7/25/24) and this Instruction to Bidders and its attachments. Following is a summary description of the scope of work: Bid Item #1 – General Provisions A. Mobilization/Demobilization – Includes all work related to mobilizing all equipment and materials to the site, and removal of same upon completion. B. General Requirements – Includes: i. Office Trailer (if required), Temporary utilities including temporary power/ generator if required and sanitary facilities for the Contractor’s personnel, the Owner and Design Team. ii. Site Security – Provide and maintain a site security fence with locked gates. iii. Erosion and sedimentation control – Erosion controls shall be installed and maintained as necessary during site activities and will be installed at locations determined by the project team. Dirt and dust must be maintained within the Demolition Area and adjacent existing storm drainage within the runoff area must be protected with silt fence, sediment Traps and/or Straw/Hay Bale Dikes. iv. Dust control – The demolition contractor shall take appropriate measures to control dust during abatement and demolition. v. Project Sign – Provide a 4’ x 8’, pole mounted Project Sign. Include No Trespassing, Restricted Access, Hardhats Required signs etc. vi. Includes preparation and adherence to a Site-Specific Health and Safety Plan that addresses all site activities, including alternate activities, and decontamination of equipment and removal and disposal of all materials at project end. vii. Conduct and document weekly job meetings.