Construction includes all administrative work as outlined in the Division 01 General Requirements and the following using materials noted on Drawings and Specifications: Contractor shall include all labor, materials, equipment and services necessary to construct the facility per approved plans and specifications. The base bid shall include but is not limited to: removal and replacement of stucco parapet walls, removal of existing stucco cladding, stucco patching, painting exterior soffits and trellis over courtyard, painting guard rails, removal and replacement of existing single-ply membrane, base flashing, counterflashings, coping and recover with new single-ply membrane over new 1/4” coverboard, over the existing coverboard and deck, removal and replacement of roof curbs, removal, clean, paint and re-set roof drains, removal and replace Accoustical Ceiling Tiles (ACT).