Bid Item #1 – General Provisions A. Mobilization/Demobilization – Includes all work related to mobilizing all equipment and materials to the site, and removal of same upon completion. B. General Requirements – Includes: i. Office Trailer (if required), Temporary utilities including temporary power/ generator if required and sanitary facilities for the Contractor’s personnel, the Owner and Design Team. ii. Site Security – Provide and maintain a site security fence with locked gates. iii. Erosion and sedimentation control – Erosion controls shall be installed and maintained as necessary during site activities and will be installed at locations determined by the project team. Dirt and dust must be maintained within the Demolition Area and adjacent existing storm drainage within the runoff area must be protected with silt fence, sediment Traps and/or Straw/Hay Bale Dikes. iv. Dust control – The demolition contractor shall take appropriate measures to control dust during abatement and demolition. v. Project Sign – Provide a 4’ x 8’, pole mounted Project Sign. Include No Trespassing, Restricted Access, Hardhats Required signs etc. vi. Includes preparation and adherence to a Site-Specific Health and Safety Plan that addresses all site activities, including alternate activities, and decontamination of equipment and removal and disposal of all materials at project end. vii. Conduct and document weekly job meetings. viii. Project Documentation – In addition to regulatory logs, manifests and reports, include RFIs, Submittals, daily reports documenting equipment and personnel on site and work performed, progress photos and minutes of meetings. ix. Traffic Control as required. x. Snow plowing as required is the responsibility of the Contractor. C. Provision of Bonds and Insurance 2.2 Bid Item #2 – Silver Lane Plaza Abatement: • The abatement and off-site disposal of all hazardous materials. • All Abatement to be performed as required pursuant to the Bid Specifications issued 10/31/23. Abatement includes but is not limited to: ACM, LBP, PCB, Mercury Lamps and HVAC Refrigerant recovery and disposal. NOTE – Asbestos Roofing Abatement requirements in Sec. 02 82 14 Part 3.4 - B, C & D. • The demolition contractor shall handle, store and transport all abated materials in accordance with all applicable regulations. All abated material will be disposed of off-site by the demolition contractor. 2.3 Bid Item #3 – Silver Lane Demolition: • The demolition and off-site disposal of the entire structure. • Foundations, footings and floor slabs will be removed in their entirety. NOTE: East Building foundation removal is an Add Alternate. • The demolition contractor shall handle, store and transport all demolished materials in accordance with all applicable regulations. All demolished materials, including any equipment, fixtures and furnishings left in the building, will be disposed of off-site by the demolition contractor. • The demolition contractor shall take appropriate measures to control dust during demolition. • Foundation voids shall be backfilled with clean imported fill and the entire Demolition Area must be graded to preclude ponding, top-dressed with loam and seeded with grass. • Foundation voids are assumed to be relatively minor as the structure does not have subsurface levels. • Utility disconnects with appropriate termination and capping as shown and/or required and street repairs; as shown on C-101 • Existing fire hydrants will be used for the supply of water required during demolition. The Demolition Contractor shall be responsible for obtaining permission from the MDC for temporary use of water from the hydrants. • All existing paving, curbing and finishes outside of the Demolition Area will remain. The contractor shall take reasonable measures to prevent damage to these areas. • The Town of East Hartford will obtain all necessary municipal approvals and waive any permit fees required for work directly or indirectly associated with the demolition of the structure. The contractor will be responsible for all abatement permitting and paperwork.