The scope of work is for addition of one booster pump station, replacement of two existing booster pump stations, reestablishment of water services, other water system appurtenances and abandonment of existing pit-type booster pump stations and includes: Installation of one 40 GPM rated booster pump station with chlorine feed system at Johnson Fork, one 22 GPM booster pump station on Baugess Drive, one 22 GPM booster pump at Florida Street, infrastructure necessary to achieve flushing flows of 250 GPM at Johnson Fork and Baugess Drive, infrastructure necessary to achieve fire protection of 500 GPM at Florida Street, all interconnected piping and accessories, include residential pressure reducing valves where necessary