The scope of work is for the in-kind replacement of existing 8" diameter clay sanitary sewer lines with approximately 345 L.F. of new 8" PVC SDR35 diameter sanitary sewer lines on Carr Street/Packard Avenue, the in-kind replacement of existing 8" diameter clay sanitary sewer lines with approximately 504 L.F. of new 8" PVC SDR35 diameter sanitary sewer lines on Iroquois Avenue, connecting of new sewer lines to existing manholes, connecting of new sewer lines to existing sewer lines, reconnection of service laterals, installation of WYE cleanouts, site grading, demolition and reinstallation of a section of retaining wall, and related appurtenances, together with all related work as specified and shown on the Drawings.