Bethany Department of Public Works 2nd Floor Addition and Renovations Intent: 1. The Specifications and drawings are intended to cover all materials, labor, incidentals, services, etc. for the satisfactory completion of the work, unless noted otherwise. 2. All work is to be accomplished in accordance with generally accepted standards of the trade unless noted otherwise. 3. All code requirements of the local building department and local utility companies shall be adhered to and are part of these specifications as applicable. 4. All manufactured items shall be installed or applied as directed by the manufacturer's instructions. 5. The Contractor shall notify Rob White Architect LLC immediately of conflicts between the specifications, construction drawings, existing conditions, building codes, or manufacturer's installation instructions.