MOBILIZATION 1.000 LS BONDS AND INSURANCE 1.000 LS TRAFFIC CONTROL 1.000 LS REMOVAL & DISPOSAL OF EXISTING PAVEMENT 50.000 SY UNCLASSIFIED EXCAVATION 2,700.000 CY BORROW EXCAVATION 374.000 CY MAINTENANCE STONE 271.520 TON LIQUID ASPHALT BINDER PG64-22 2,393.360 TON FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 7,902.000 SY FULL DEPTH ASPH. PAV. PATCHING 10"UNIF 17,950.000 SY MILLING EXISTING ASPHALT PAVEMENT 1.0" 16,150.000 SY MILLING EXISTING ASPHALT PAVEMENT 2.0" 367,645.000 SY MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 14,100.000 SY MILLED-IN RUMBLE STRIP 2.280 MI HOT MIX ASPHALT INTERMEDIATE COURSE TYPE B 12,152.827 TON HOT MIX ASPHALT SURFACE COURSE TYPE B 26,596.453 TON DRIVEWAY PAVING-SURFACE TYPE B 231.876 TON WARM MIX ASPHALT INTERMEDIATE COURSE TYPE B - SPECIAL 4,843.520 TON PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 6,346.000 SF 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 64,566.000 LF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 57,810.000 LF 8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 42,400.000 LF 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 9,378.000 LF WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 216.000 EA WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 36.000 EA WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 36.000 EA WHITE LANE DROP ARROW (LEFT OR RIGHT)-FAST DRY PAINT 4.000 EA 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 17,990.000 LF 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 315,412.000 LF 6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT 3,200.000 LF 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 17,619.000 LF 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 17,842.000 LF 8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 12,015.000 LF