MOBILIZATION 1.000 LS BONDS AND INSURANCE 1.000 LS TRAFFIC CONTROL 1.000 LS REMOVAL & DISPOSAL OF EXISTING CONCRETE 35.000 CY BORROW EXCAVATION 250.000 CY EXCAVATION FOR SHOULDER PAVING 63.438 STA HAULING OF EXCAVATED SHOULDER MATERIAL 63.438 STA MAINTENANCE STONE 2.900 TON HMA SHOULDER WIDENING COURSE 598.520 TON LIQUID ASPHALT BINDER PG64-22 160.455 TON ARAMID FIBER 475.000 LB FULL DEPTH ASPH. PAV. PATCHING 4" UNIF. 200.000 SY FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 90.000 SY MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 2,200.000 SY HOT MIX ASPHALT SURFACE COURSE TYPE D 1,860.020 TON DRIVEWAY PAVING-SURFACE TYPE D 148.125 TON PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 292.000 SF 4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 130.000 LF 4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 6,470.000 LF 6" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 80.000 LF 12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)PERM.PVMT.MARK 20.000 LF 24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 105.000 LF 4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 30.000 LF 4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 6,470.000 LF 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 260.000 LF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 12,940.000 LF 6" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 160.000 LF 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 210.000 LF 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 60.000 LF 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 12,940.000 LF 6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT 170.000 LF PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 15.000 EA PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 87.000 EA