This project consists of removal and replacement of the asphalt trail and basketball courts, along with two (2) new pickleball courts at Scenic Valley Park. 1 Mobilization & General Conditions LS 1 2 Construction Staking LS 1 3 PCC Sidewalk and Bench Pad Removal SY 32 4 Basketball Court – HMA Removal SY 555 5 Basketball Hoop – Removal and Disposal EA 2 6 Topsoil Strip, Salvage and Respread LS 1 7 Excavation Class 10 and Imported Fill CY 340 8 Subgrade Preparation – 12” Depth CY 432 9 Court Subbase – 6” Depth SY 1,107 10 3.5” HMA Base Course – (1/2 Aggregate) SY 1,044 11 1.5” HMA Surface Course – (3/8”) Aggregate SY 1,044 12 Acrylic Court Surfacing SY 1,044 13 Reinforced PCC Pavement – 5” PCC (Sidewalk & Picnic Area) SY 60 14 12” x 12” Court Perimeter PCC Curb LF 268 15 96” Tall Black Vinyl Chain Link Fence LF 253