1. 1 Force Account Minor Changes 1-04.4(1) At $25,000.00 Force Account $25,000.00 2. 1 Lump Sum Survey 1-05.4 At _______.__ Lump Sum _______.__ 3. 1 Lump Sum Record Drawings (Minimum Bid $500) SP 1-05.18 At _______.__ Lump Sum _______.__ 4. 1 Lump Sum SPCC Plan 1-07.15 (1) At _______.__ Lump Sum _______.__ 5. 1 Lump Sum Mobilization 1-09.7 At ________.__ Lump Sum ________.__ 6. 1 Lump Sum Project Temporary Traffic Control 1-10.4(3) At _______.__ Lump Sum ________.__ 7. 1 Force Account Work Zone Safety Contingency 1-10.5(2) At $2,000.00 Force Account $2,000.00 8. 1 Lump Sum Clearing and Grubbing SP 2-01.5 At ________.__ Lump Sum ________.__ 9. 1 Lump Sum Removal of Structures and Obstructions SP 2-02.5 At _______.__ Lump Sum __