Work of the Project generally includes the replacement of select process equipment, equipment and support repaired, coating of the existing piping, and associated electrical improvements within the booster pump station, as well as installation of four (4) vacuum relief valve vaults along existing force main. More specifically, the Work includes, but is not limited to, construction of the following: 1. Replacement of all four (4) check valves and associated piping and instrumentation improvements. 2. Replacement of existing manual valve actuators with automated valve actuators and associated electrical improvements. 3. Rehabilitation of two (2) concrete pipe supports at discharge piping elbows. 4. Installation of three (3) H2S sensors and associated electrical improvements. 5. Replacement of existing pump vibration switches and associated electrical improvements. 6. Replacement of power system monitoring equipment. 7. Preparation and recoating of all piping within the pump station. 8. Installation of four (4) vacuum relief valve vaults on existing forcemains. 9. Site improvements to support items above. 10. Site electrical improvements to support items above including duct banks, instrumentation and controls.