201.52 TRIMMING OF TREES HR 30.00 202.7 REMOVAL OF GUARDRAIL LF 31,316.00 203.1 COMMON EXCAVATION CY 6,480.00 203.2 ROCK EXCAVATION CY 120.00 203.5561 EAGRT PLATFORM PREFERRED U 13.00 203.5598 GUARDRAIL E-3 PLATFORM LF 997.50 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 25.00 214. FINE GRADING U 1.00 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 4,042.00 304.41 CRUSHED STONE (FINE GRADATION) FOR SHIM CY 2,057.80 403.11022 HBP-3/4" BINDER MIX, MACHINE METHOD, QC/QA TIER 2 TON 9,740.00 403.11023 HBP-3/4" BINDER MIX, MACHINE METHOD TON 280.00 403.11053 HBP-3/8" SURFACE MIX, MACHINE METHOD TON 130.00 403.11851 HBP-3/8" SURFACE MIX, MACHINE METHOD, POLYMER MODIFIED, QC/QA TIER 1 TON 30,800.00 403.11852 HBP-3/8" SURFACE MIX, MACHINE METHOD, POLYMER MODIFIED, QC/QA TIER 2 TON 3,250.00