A. Supply all temporary shoring, lighting, barricades, signage and protection necessary to protect the building areas, building systems, and building patrons and public. Maintain such protection for the complete duration of the project. B. Supply all disposal facilities, transportation and labor necessary to dispose of all demolished materials, dirt, and debris off-site in a legal dumping area. The Contractor shall obtain all permits necessary to transport and dispose of all materials, rubbish and debris. C. Provide temporary fencing around set-up and storage locations. Set-up and lay down areas should be sufficient for all sub-trades to have adequate area to store materials and equipment. Set-up and lay down areas must be within areas designated by the Owner. D. Complete all associated work in accordance with the project specifications and Contract Drawings. Coordinate the work with the Owner. E. The Contractor shall provide all lifts, cranes, and equipment necessary to access and perform the work. F. Remove and dispose of existing roofing materials including but not limited to, stone ballast, roof membrane, fiberboard, and insulation, down to the existing metal deck to remain at Roof Area A as indicated in the Contract Documents. G. At Roof Areas B, C and D, remove and dispose of existing standing seam roof system including, but not limited to, standing seam metal panels and plywood deck down to the existing truss structure to remain. H. At Roof Areas B, C and D, install cold-form metal framing structural augmentation at locations and as indicated in the Contract Documents. I. Remove and dispose of associated roof flashings and components as indicated in the Contract Documents.