The first location is at Forest Avenue and North Blvd. At this location there is two damaged conduits leading underground. Sidewalk will need to be removed at the site and a new, matching existing, galvanized rigid conduit will be installed. Restoration of the light wiring to all the lighting fixtures is required of the project. Sidewalk restoration at the site is also required of the selected contractor. All lights in the project zone will be returned to standard operating as a condition of a completed project. The second location is Clinton Ave between North Blvd and South Blvd. At this location all existing conduit will be removed and replaced with 2-inch PVC coated galvanized rigid conduit. All junction boxes will also be replaced with the project. All junction boxes and fittings will also be PVC coated galvanized. Replacement of all conduit hangars shall be galvanized. Conduit up to the flexible conduit whip will be replaced under the entire project area. The lighting and flexible conduit whip will remain and be reconnected upon completion. All lights in the project zone will be returned to standard operating as a condition of a completed project.