PROPERTY ADDRESS: 210 The Hollows Court, Hendersonville, TN 37075 - If the existing landscaping is damaged during the course of construction, landscaping will be replaced in kind after construction is complete. The new plantings will be coordinated with property owner. - The existing mailbox will be maintained during construction. - During project construction driveway access will be maintained and any closure will be coordinated with the property owner. If needed temporary access will be built. - If the trees are damaged/removed during construction they will be replaced with new trees (4” diameter caliper or greater) in the same general location. Tree species will be coordinated with property owner. - Any damage to the property during construction or while removing trees will be restored to an in-kind condition or better. PROPERTY ADDRESS: 201 The Hollows Court, Hendersonville, TN 37075 - If the existing mailbox is removed during construction then a new mailbox will be built back with the same likeness and material, specifically the use of natural stone. - Care will be taken to protect the existing trees along the stream bank. If the trees are damaged during construction they will be replaced with new trees (4” diameter caliper or greater) in the same general location. Tree species will be coordinated with property owner. - Gabion baskets will only be used as represented in the plans (beginning at the pipe outlet and extending along the curve) and will not be stacked. The existing ground slope will be tied into the top of the basket and stabilized with permanent vegetation. - Internet service must not be disrupted during construction. The fiber optic line must be located and marked prior to construction.