development of 7 new buildings and associated site work, located on an approximately 6.18 acre site. Site improvements consist of, but are not limited to new paving, perimeter fencing, vehicle and man gates, EV infrastructure and chargers, landscaping, irrigation, storm water and all other underground utilities. Other site work includes full street frontage improvements along 29th Street E. The 7 new buildings are further described below: Building A: Administrative/Crew Building: A one-story building providing office and crew facilities for the Operations & Parks department employees, including a lobby, crew rooms, supervisor offices, a multipurpose/lunch room, a wellness room, mud rooms, and locker rooms. Wood framed Type VB construction type and a mix of A and B occupancy types. Fully Sprinklered. Building B: Construction of a new unconditioned building to serve as covered parking and vehicle storage. A small portion of the building will be used for material storage. The building will be mostly enclosed on three sides and open on the fourth side. Type IIB construction with S-2 occupancy. Fully sprinklered. Building C: Shop/Vehicle Storage Building: A one-story building providing shop facilities & multi-use bays, and both covered/unheated & enclosed/heated vehicle and material storage. Pre-engineered metal building Type IIB construction type with mix of B, S-1 and S-2 occupancy. Fully Sprinklered. Building D: Fleet Shop, Fuel & Wash Building: A one-story building providing shop & office facilities for the Fleet department, as well as wash and fueling bays. Pre-engineered metal building Type IIB construction type with mix of B, F-2, S-1 and S-2 occupancy. Fully Sprinklered. Building E: Construction of a new unconditioned building to serve as covered vehicle and material storage. The building will be mostly enclosed on three sides and open on the fourth side. Type IIB construction with S-2 occupancy. Fully sprinklered. Building F: Construction of a new unconditioned building to serve as covered vehicle and material storage. The building will be mostly enclosed on three sides and open on the fourth side. Type IIB construction with S-1 occupancy. Fully sprinklered.