removal and replacement of two pedestrian bridges that provide access to the guestroom building adjacent to the park Lodge. The new bridges will be constructed of structural steel with cast-in-place concrete walking surfaces. Both bridges will be covered with roofs constructed of wood trusses bearing on structural steel framing, with plywood sheathing and shingle roofing. One bridge will tie into the existing structure of both the Lodge and the guestroom building, while the other will be structurally independent and have an expansion joint where it meets the guestroom building. New lighting and sprinklers will be installed within the roof structure of both bridges. The project also includes removal and replacement of two sets of cast-in-place concrete stairs that lead from the parking lot down to the first floors of the guestroom building and Lodge, as well as replacement of a steel pipe railing behind the lodge that provides protection for an existing segmental site retaining wall.