1. This contractor is responsible for providing dumpsters and temporary sanitary facilities for all bid packages as part of this project. 2. This contractor shall provide and install new tectum panels and furring strips on the gym ceiling as noted in the contract documents. 3. All work is to be constructed in compliance with state building codes and industry standard practices. 4. This contractor is responsible for patching and painting holes in plaster wall at demoed HVAC units and conduits, touch up paint shall match existing. 5. This contractor shall remove stud and drywall infill on corridor side for sliding door access to move materials into the gym. This shall include replacing studs and drywall infill, paint to match existing conditions. 6. Contractor to verify all dimensions and site conditions shown with field measurements, quantities shown, and square foot numbers noted are estimates. Report any discrepancies to the architect & engineer prior to proceeding with work. 7. This contractor shall provide new VCT tiles in gym floor to patch back floor where demoed HVAC units have been removed. 8. This contractor is responsible for patching 20” holes in plaster ceiling from existing lights with ½” drywall. Contractor shall coordinate with Bid Package #3 for the removal of lighting units as necessary. 9. This contractor shall be responsible for patching of all holes in plaster walls at demoed conduits, painting to match. Coordinate with Bid Package #2 as necessary. 10. This contractor shall paint new conduits and metal cover to match existing wall color, coordinate with Bid Package #2 and #3 as necessary. 11. This contractor shall coordinate the use of elevator with owner, verifying elevator weight capacity for materials and equipment as necessary. Elevator cab protection shall be provided by this contractor when in use.