Installation: The film shall be applied as to the specifications of 3M by an ADA. a. Materials will be delivered to the job site with the manufacturer’s labels intact and legible. b. To minimize waste, the film may be cut to specification utilizing a vertical dispenser designed for that purpose. Film edges shall be cut neatly and square at a uniform distance of 1/8" (3 mm) to 1/16" (1.6 mm) of the window-sealing device. c. Film shall be wet-applied using clean water and slip solution to facilitate positioning of the film onto glass. d. To ensure efficient removal of excess water from the underside of the film and to maximize bonding of the pressure sensitive adhesive, plastic bladed squeegees shall be used. e. Upon completion, the film may have a dimpled appearance from residual moisture. Said moisture shall, under reasonable weather conditions, dry flat with no moisture dimples within a period of 30 calendar days when viewed under normal viewing conditions. f. After installation, any leftover material will be removed, and the work area will be returned to original condition. Use all necessary means to protect the film before, during and after the installation...