1. Construction of a Large Vehicle Maintenance & Storage Facility that will include space for storing and maintaining Massport’s fleet of approximately 600 vehicles including heavy equipment such as snow removal equipment and deicing, employee office and work areas, the electrical department, sign shop, carpentry shop, central stock room, repairs bays for the large vehicles, wildlife management, and a new fueling station. 2. Repurposing of the Green Bus Depot including renovation and an addition to store some of the large equipment not going into the LVSMF such as the snow melters, and the repairs bay for Massport small vehicles. 3. A new Salt Shed on the landside 4. Transfer Station reconfiguration 5. Restoration of the existing sand shed 6. Construction of a new green resiliency berm along the South/East side of the NSA shoreline. The berm is part of the resiliency mitigation strategies within the Boston Metropolitan Coastal Storm Risk Analysis. 7. Construction of a new airside service road 8. Relocation of the existing fuel station 9. Site and SIDA modifications 10. A possible new parking structure to relocate existing surface parking 11. Relocation of FAA structures & transformer 12. Demolition of existing structures in the North Service Area 13. Provide Airside access to both Gate Gourmet and Sky Chefs to mitigate traffic on public road and through the North Gate.