202.7 REMOVAL OF GUARDRAIL LF 16,500.00; 203.2 ROCK EXCAVATION CY 150.00; 203.5540 GUARDRAIL TAPERED RAIL PLATFORM LF 150.00; 203.5561 EAGRT PLATFORM PREFERRED U 17.00; 203.5562 EAGRT PLATFORM ALTERNATE U 55.00; 203.5571 EAGRT PLATFORM PREFERRED, TL 2 - 25' U 4.00; 203.5598 GUARDRAIL E-3 PLATFORM LF 300.00; 203.82 EXTRA DRILLED HOLES WITHOUT EXPLOSIVES LF 450.00; 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 100.00; 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 5,600.00; 403.12 HBP-HAND METHOD TON 100.00; 410.22 ASPHALT EMULSION FOR TACK COAT GAL 11.00; 585.3 STONE FILL, CLASS C CY 10.00; 593.421 GEOTEXTILE; PERM CONTROL CL.2, NON-WOVEN SY 50.00; 606.0001 STEEL BEAM FOR BEAM GUARDRAIL, INCLUDING HARDWARE LF 75.00...