1. Initial Assessment: - Conduct a comprehensive assessment of the existing cooling tower system. - Identify the specific water treatment needs and challenges. - Analyze water quality parameters including pH, conductivity, hardness, total dissolved solids (TDS), and microbiological content. 2. Treatment Plan Development: - Design a customized water treatment plan tailored to the specific requirements of the cooling tower systems. - Select appropriate chemical treatment products and dosing methods. - Consider environmental and safety regulations in the selection process. 3. Chemical Supply and Dosage: - Provide necessary chemicals for water treatment, including biocides, corrosion inhibitors, scale inhibitors, and dispersants. - Develop a dosing schedule and method to ensure accurate and efficient chemical application. - Implement control measures to monitor chemical levels and adjust dosages as needed. - The contractor will be responsible for managing the transportation of chemicals and replenishing point-of-use containers as needed. - Provide glycol dosing concentration to existing systems to maintain Plant Operations percentage levels and provide system replacement...