The proposed improvements include roadway re-surfacing and striping reconfiguration on Olympic Hwy North from C Street to Wallace Kneeland Blvd, as well as curb extensions, ADA-compliant curb ramps, Rectangular Rapid Flashing Beacons (RRFB’s), signage, high visibility crosswalk markings, and other pedestrian and related improvements on Olympic Hwy North and three other locations throughout the City. Anticipated services include, but are not limited to, field survey and mapping, engineering design, traffic and signal analysis, geotechnical support, environmental permittng support, public outreach and engagement support, and other elements necessary to develop construction-ready contract documents (plans, specifications, and estimates). Although these projects utilize different funding sources and cover multiple locations, the City’s intent for this design is to consolidate the projects into a single construction contract, with distinct schedules for each project location. The City of Shelton reserves the right to retain the services of the successful firm for any associated subsequent phases (R/W, CN).