The general contractor shall prepare the restroom building subgrade to receive the prefabricated building in accordance with the bid subgrade preparation drawings or foundation plan. 1. The building subgrade/footings shall be constructed per the bid drawings. 2. The General Contractor shall provide water point of service at 30” below finished building slabs; sewer at 24” below the finished building slabs; and electrical at 36” below the finished building slabs or other per bid plans. 3. General Contractor shall coordinate with restroom subcontractor to provide full site delivery access for a 70’ tractor-trailer and hydro crane to the final building sites. 4. If the final site access is over existing sidewalks, utilities, or landscaping, the General Contractor shall be responsible for plating and or tree trimming, utility line removal, or other to protect any existing conditions. 5. The hydro crane must be able to locate no greater than 35’ from the center point of the building to the center point of the crane. 6. The utilities shall be furnished per bid site plans at specified points of connection (POC) nominally 6’ from the building lines. 7. General contractor shall furnish and install final grading, landscaping and sidewalks...