The Scope of this project includes: 1. Removing the front two (2) 14’ x 14’ Sectional Bay doors and all associated hardware and components. 2. Evaluation of removed equipment for serviceability in other roll-up door locations and disposal of remaining equipment. 3. Installation of two (2) Door Engineering FF30 (or comparable), 14’ x14’ doors with 4 windows per panel and two (2) remotes per door. 4. The contractor shall provide all necessary equipment and material required to remove, dispose, and install two (2) Four-Fold doors. Please note: all installation must be to manufacturer specifications. Finish with epoxy primer followed by polyurethane finish paint. Owner to select from manufacturer’s standard RAL color chart. Glass must be tempered safety glass. Any electrical wiring to include power and low voltage for safety features/wall controls are the responsibility of the winning bidder.