The work shall consist of the rehabilitation of deteriorated wastewater collection mains and laterals using the cured-in-place pipe (CIPP) process to correct structural defects and to reduce inflow/infiltration. It will include all labor, materials, and equipment necessary to control or eliminate infiltration/inflow which now enters the sewer system and to correct structural problems at various locations throughout the city, (See map drawings attached). This contract is for a period of one hundred eighty (180) calendar days. Work to be performed will consist of but not limited to, repair of leaking and/or defective main lines of the wastewater collection system. The work performed under this contract will be performed citywide, as shown on map drawings.