Snow removal shall commence when the local snow accumulation reaches two (2) inches or upon Facility Managers request. Snow plowing shall be accomplished by the Vendor to maintain safe passage for access into buildings, parking areas, roadways, approaches, vehicular courts, ramps, etc., as needed. De-icing shall commence as necessary to maintain a safe passage on all paved roadways, parking areas, driveways, ramps, etc. Environmentally friendly de-icing products that will not damage concrete entrances, walkways and steps, shall be used to prevent ice buildups. All chemicals used shall, at a minimum, comply with State of Illinois environmental regulations and local codes. Snow shall be piled in the most remote area of lot or stockpiled only in those areas approved by the CMS Facility Manager or designee. Some locations may require that snow be removed from the premises the same day. Snow shall be pushed off roads, parking areas, walkways, ramps, etc. without blocking traffic, parking spaces, pedestrian thoroughfares or impeding the visibility of vehicular operators, pedestrians, tenant agency operations or creating a safety hazard MILESTONES AND DELIVERABLES: Vendor shall make efforts to have all areas cleared of snow by 7:00 A.M., seven days per week including weekends and holidays. Vendor shall furnish adequate labor, material and equipment to adhere to all specifications of the contract to provide snow removal.