Vendor shall provide all equipment, materials, tools and labor to remove and replace existing sally-port gate system. Vendor shall remove two (2) existing gate operators and existing track currently on the gate. Vendor shall remove/replace both the latch and forward gate post. Bid at existing dimensions as well as a new opening for the gate system at 20 feet wide. Determination will be made based on funding availability. Vendor shall furnish and install a new aluminum framework gate with 6-guage chain link to include an internal track rail mounted to an I-Beam allowing for internal trollies with sealed bearings that do not require greasing. Vendor shall furnish and install two (2) Hysecurity Slidedriver 15 hydraulic gate operators. Operators are to be mounted on a custom platform three (3) feet off the ground. Vendor shall ensure each operator has a built-in heater and an extreme drive system that has a cogged wheel system on the bottom of the rail. Vendor shall ensure each operator has a solenoid deadbolt lock installed so gate will be locked when in the closed position and unable to be pushed open. Vendor shall hook controlled access into the new operators.