The furnishing of all labor, material, and equipment necessary for: Prepare Site – Move existing infrastructure that would impede work to a location that allows work to be performed. Once work is completed return all infrastructure to location directed by attendant. Excavate site Prepare existing asphalt edge Pour concrete slab Trench drain Hot mix asphalt tack coat on all vertical cut surfaces Install bollards Provide and install quantity 2 20’ conex containers Provide and install quantity 2 Awnings for conex containers Provide and install oil/water separator Provide and install 2,500 gallon plastic water tank Erosion control ADA parking stall Refer to Construction Drawings for further information on scope, and other requirements.