Fire Sprinkler Inspection/Testing/Maintenance: a. Maintain UL certification of “fire extinguishing system(s) identified in Health and Safety Code Section 13195, and shall incorporate by reference NFPA 25, Inspection, Testing, and Maintenance of Water-Based Fire Protection System (2013 edition) b. Test and inspect fire system devices annually, including functional tests. Quarterly inspections to be performed on flow switch on riser, per NFPA 25. c. Per NFPA 25, Annual and Quarterly Maintenance, Summary of Sprinkler System Inspection, Testing and Maintenance. d. Per NFPA 25, Quarterly, Annual Maintenance, Summary of Standpipe and Hose Systems Inspection, Testing and Maintenance. e. Per NFPA 25 and California Title #19, Perform five (5) year fire sprinkler inspection and testing including back flush of the existing Fire Department connection(s) (FDC), when FDC check valve(s) are accessible and internal pipe/valve inspections (face and clapper gasket and fire riser gauge costs, when necessary, shall be included) f. Testing to be scheduled in advance with on-site contact. Test results to be provided to the DPR Area on-site contact and sent to DPR Facilities Coordinator to the following address: 4940 Lang Avenue, McClellan Park, CA 95652, Documentation to include make, model, and serial number of equipment.