The Work may be generally described as the expansion of the existing terminal apron to additional Remaining Overnight (RON) parking areas. This project also includes improvements to the existing storm drainage system; installation of edge lights and area lighting for the new RON apron. All work shall be performed in accordance with CCAA and Federal Aviation Administration (FAA) requirements. All materials provided by the awarded Contractor must be new, free from defects and must meet CCAA’s specifications. Bidder shall submit the make and model of materials that will be used for the work. After award of contract, no change to materials and products, except when the lack of availability is beyond the Contractor’s control, i.e., due to strike bankruptcy, discontinuance of manufacture, etc. Request for substitutions shall be made in writing and hall be accompanied by complete description of the substituted material or equipment. Substitution requests must receive written approval from Owner prior to being ordered and installed.