1) Mobilization. 1 LS $ $ 2) Demolition of Bridge. 1 LS $__________ $___________ 3) Clearing and grubbing. 1 LS $ $ 4) Grading, complete 462 CY $ $ in place. 5) 6” PCC curb and gutter, 200 LF $ $ complete in place. 6) 6” PCC driveway apron, 420 SF $ $ complete in place. 7) 10” PCC culvert concrete apron, 1,020 SF $__________ $___________ 8) Concrete toe of wall 150 SF $__________ $___________ complete in place. 8) 4”-2”Asphaltic concrete on 6” 4,275 SF $_________ $___________ aggregate base, complete in place. 9) Removal existing guard rail, 175 LF $ $ complete in place. 10) Reset existing guard rail 175 LF $ $ complete in place. 11) Remove and reset traffic signs 1 LS $ $ complete in place. 12) Install 6’x10’ Precast concrete 10 EA $__________ $___________ box culvert complete in place. 13) Install pre-cast wing walls 4 EA $_________ $___________ complete in place. 14) Erosion control, include top soil, seed, 1 LS $ $ Fertilized and straw all disturbed areas. Include water way barriers 15) Traffic Control Complete in place 1 LS $___________ $___________