1. Full Depth Saw Cut LF 2,805 2. 2’ PCC Curb and Gutter, Remove and Replace LF 1,434 3. 4” PCC Sidewalk, Remove and Replace SY 687 4. 4” PCC Sidewalk, Remove Existing SY 27 5. 6” PCC Sidewalk, Remove and Replace SY 287 6. PCC Sidewalk, Pedestrian Ramp SY 262 7. Detectable Warning Panel SF 350 8. Existing Driveway Approach, Remove SY 29 9. 6” PCC Alley Approach, Remove and Replace SY 723 10. Remove 6” PCC Pavement and Replace with 7” PCC Pavement (M-Mix) SY 52 11. Sanitary Sewer Manhole, Adjust Top, Use Existing Rings, Casting and Cover EACH 5 12. Internal Chimney Seal EACH 5 13. Storm Sewer Intake, Remove and Construct Type “C” EACH 1 14. Water Valve, Adjust Road Box EACH 7 15. Pavement Scarification SY 6,625 16. Hot Mix Asphalt Standard Traffic, Base Course, 1/2 In. Mix TON 450 17. Hot Mix Asphalt Standard Traffic, Surface Course, 1/2 In. Mix, No Special Friction Requirement TON 540 18. Asphalt Binder, PG 58-28S, Standard Traffic TON 60 19. Seeding and Fertilizing, Urban LS 1 20. Topsoil TON 350 21. Traffic Control LS 1 22. Mobilization LS 1 The method of construction shall be by contract. All work is to be done in strict compliance with plans and