1. Sitework preparation includes demolition of an existing concrete slab, masonry wall with wood truss roof bathhouse, tree removal, grubbing, reworking existing underground utilities, and earthwork for the construction of a new shower-restroom building, RV dump station and septic field. 2. Work on shower-restroom building includes concrete foundation, slab and masonry wall construction with whole tree columns and engineered timber roof framing system with metal roof. Building to reconnect existing underground electrical, water and septic services. A new water line and spigot to be installed at RV dump station. Work also includes wood and metal trim, glass-mat sheathing, firestopping, and wire mesh ceilings. Carpentry includes wood stud wall partition framing, timber roof, timber benches and shelving. Finishes include CMU sealer, interior and exterior staining, painted metal doors and frames, and door hardware. Equipment includes toilet room accessories, signage, plumbing fixtures, electrical outlets, interior and exterior lighting, heat pump hot water heaters, propane hot water heater, water pressure tanks and chlorination system, and ventilation equipment, complete and ready for use. 3. Sitework includes reconnecting existing utilities, new propane tank, grading, paving, road gravel layer, and landscaping, complete and ready for use.